{"id":4464,"date":"2023-12-14T14:01:41","date_gmt":"2023-12-14T17:01:41","guid":{"rendered":"https:\/\/ambarenergia.com.br\/ambar-energia-signs-contract-to-acquire-araucaria-thermoelectric-power-plant-in-parana\/"},"modified":"2024-06-21T16:27:43","modified_gmt":"2024-06-21T19:27:43","slug":"ambar-energia-signs-contract-to-acquire-araucaria-thermoelectric-power-plant-in-parana","status":"publish","type":"post","link":"https:\/\/ambarenergia.com.br\/en\/ambar-energia-signs-contract-to-acquire-araucaria-thermoelectric-power-plant-in-parana\/","title":{"rendered":"\u00c2mbar Energia signs contract to acquire Arauc\u00e1ria Thermoelectric Power Plant, in Paran\u00e1"},"content":{"rendered":"\n<p>Acquisition is part of the growth strategy in energy security assets and South American integration<\/p>\n\n<p>\u00c2mbar Energia, a company of the J&amp;F group, announced the signing of a contract for the purchase of 81.2% of the Arauc\u00e1ria Thermoelectric Power Plant (UTE Arauc\u00e1ria), located in the municipality of the same name, in Paran\u00e1. The asset belongs to Companhia Paranaense de Energia (Copel) and Copel Gera\u00e7\u00e3o e Transmiss\u00e3o S.A., and was traded for R$ 320.7 million. \u00c2mbar&#8217;s strategic investment represents the company&#8217;s ongoing commitment to the country&#8217;s energy security.<\/p>\n\n<p>UTE Arauc\u00e1ria is a natural gas-fired generation facility with an installed capacity of 484.15 megawatts (MW), operating in a combined cycle with two gas turbines and one steam turbine. Since its inauguration in 2002, the Arauc\u00e1ria TPP has played a vital role in the production of energy for the national interconnected system.<\/p>\n\n<p>&#8220;The incorporation of UTE Arauc\u00e1ria strengthens our solid commitment to the country&#8217;s energy security, contributing to ensuring a stable and reliable supply of energy throughout the energy transition process,&#8221; said Marcelo Zanatta, president of \u00c2mbar Energia.<\/p>\n\n<p>In terms of natural gas-fired generation assets, \u00c2mbar already owned the Cuiab\u00e1 TPP, connected by its own gas pipelines to the Bolivian basins, and the Uruguaiana TPP, integrated into Argentina&#8217;s gas reserves. The Arauc\u00e1ria TPP, on the other hand, is connected by pipelines to the gas reserves of Brazil and Bolivia.<\/p>\n\n<p>&#8220;With this acquisition, we have expanded our presence in the South American energy system and our strategic position as a generator and trader of energy from diversified sources,&#8221; says Zanatta.<\/p>\n\n<p>\u00c2mbar, which operates in the generation and commercialization of energy and in the transportation of gas, now has a total generation capacity of 2.3 gigawatts (GW) with this transaction.<\/p>\n\n<p>The closing of the transaction is subject to conditions precedent customary in this type of contract, such as regulatory approvals. Petrobras, which holds the remaining 18.8% of the Arauc\u00e1ria TPP, will be able to adhere to \u00c2mbar&#8217;s proposal until February 26, 2024.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Acquisition is part of the growth strategy in energy security assets and South American integration \u00c2mbar Energia, a company of the J&amp;F group, announced the signing of a contract for the purchase of 81.2% of the Arauc\u00e1ria Thermoelectric Power Plant (UTE Arauc\u00e1ria), located in the municipality of the same name, in Paran\u00e1. The asset belongs [&hellip;]<\/p>\n","protected":false},"author":6,"featured_media":4310,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_uag_custom_page_level_css":"","site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-gradient":""}},"footnotes":""},"categories":[82],"tags":[59],"class_list":["post-4464","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-ambar-en","tag-energy-security"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v24.7 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>\u00c2mbar Energia signs contract to acquire Arauc\u00e1ria Thermoelectric Power Plant, in Paran\u00e1 - \u00c2mbar Energy<\/title>\n<meta name=\"description\" content=\"Energy generation, transmission and commercialization\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/ambarenergia.com.br\/en\/ambar-energia-signs-contract-to-acquire-araucaria-thermoelectric-power-plant-in-parana\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\u00c2mbar Energia signs contract to acquire Arauc\u00e1ria Thermoelectric Power Plant, in Paran\u00e1 - \u00c2mbar Energy\" \/>\n<meta property=\"og:description\" content=\"Energy generation, transmission and commercialization\" \/>\n<meta property=\"og:url\" content=\"https:\/\/ambarenergia.com.br\/en\/ambar-energia-signs-contract-to-acquire-araucaria-thermoelectric-power-plant-in-parana\/\" \/>\n<meta property=\"og:site_name\" content=\"\u00c2mbar Energy\" \/>\n<meta property=\"article:published_time\" content=\"2023-12-14T17:01:41+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-06-21T19:27:43+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/ambarenergia.com.br\/wp-content\/uploads\/2024\/05\/UEGA-2.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"800\" \/>\n\t<meta property=\"og:image:height\" content=\"477\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Gabriela Vinhal\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Gabriela Vinhal\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/ambarenergia.com.br\/en\/ambar-energia-signs-contract-to-acquire-araucaria-thermoelectric-power-plant-in-parana\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/ambarenergia.com.br\/en\/ambar-energia-signs-contract-to-acquire-araucaria-thermoelectric-power-plant-in-parana\/\"},\"author\":{\"name\":\"Gabriela Vinhal\",\"@id\":\"https:\/\/ambarenergia.com.br\/en\/#\/schema\/person\/b9589679b1ad2fe56bfa57eb11e6f9df\"},\"headline\":\"\u00c2mbar Energia signs contract to acquire Arauc\u00e1ria Thermoelectric Power Plant, in Paran\u00e1\",\"datePublished\":\"2023-12-14T17:01:41+00:00\",\"dateModified\":\"2024-06-21T19:27:43+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/ambarenergia.com.br\/en\/ambar-energia-signs-contract-to-acquire-araucaria-thermoelectric-power-plant-in-parana\/\"},\"wordCount\":344,\"publisher\":{\"@id\":\"https:\/\/ambarenergia.com.br\/en\/#organization\"},\"image\":{\"@id\":\"https:\/\/ambarenergia.com.br\/en\/ambar-energia-signs-contract-to-acquire-araucaria-thermoelectric-power-plant-in-parana\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/ambarenergia.com.br\/wp-content\/uploads\/2024\/05\/UEGA-2.jpg\",\"keywords\":[\"Energy security\"],\"articleSection\":[\"\u00c2mbar\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/ambarenergia.com.br\/en\/ambar-energia-signs-contract-to-acquire-araucaria-thermoelectric-power-plant-in-parana\/\",\"url\":\"https:\/\/ambarenergia.com.br\/en\/ambar-energia-signs-contract-to-acquire-araucaria-thermoelectric-power-plant-in-parana\/\",\"name\":\"\u00c2mbar Energia signs contract to acquire Arauc\u00e1ria Thermoelectric Power Plant, in Paran\u00e1 - \u00c2mbar Energy\",\"isPartOf\":{\"@id\":\"https:\/\/ambarenergia.com.br\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/ambarenergia.com.br\/en\/ambar-energia-signs-contract-to-acquire-araucaria-thermoelectric-power-plant-in-parana\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/ambarenergia.com.br\/en\/ambar-energia-signs-contract-to-acquire-araucaria-thermoelectric-power-plant-in-parana\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/ambarenergia.com.br\/wp-content\/uploads\/2024\/05\/UEGA-2.jpg\",\"datePublished\":\"2023-12-14T17:01:41+00:00\",\"dateModified\":\"2024-06-21T19:27:43+00:00\",\"description\":\"Energy generation, transmission and commercialization\",\"breadcrumb\":{\"@id\":\"https:\/\/ambarenergia.com.br\/en\/ambar-energia-signs-contract-to-acquire-araucaria-thermoelectric-power-plant-in-parana\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/ambarenergia.com.br\/en\/ambar-energia-signs-contract-to-acquire-araucaria-thermoelectric-power-plant-in-parana\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/ambarenergia.com.br\/en\/ambar-energia-signs-contract-to-acquire-araucaria-thermoelectric-power-plant-in-parana\/#primaryimage\",\"url\":\"https:\/\/ambarenergia.com.br\/wp-content\/uploads\/2024\/05\/UEGA-2.jpg\",\"contentUrl\":\"https:\/\/ambarenergia.com.br\/wp-content\/uploads\/2024\/05\/UEGA-2.jpg\",\"width\":800,\"height\":477},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/ambarenergia.com.br\/en\/ambar-energia-signs-contract-to-acquire-araucaria-thermoelectric-power-plant-in-parana\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"In\u00edcio\",\"item\":\"https:\/\/ambarenergia.com.br\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\u00c2mbar Energia signs contract to acquire Arauc\u00e1ria Thermoelectric Power Plant, in Paran\u00e1\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/ambarenergia.com.br\/en\/#website\",\"url\":\"https:\/\/ambarenergia.com.br\/en\/\",\"name\":\"\u00c2mbar Energia\",\"description\":\"Energy generation, transmission and commercialization\",\"publisher\":{\"@id\":\"https:\/\/ambarenergia.com.br\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/ambarenergia.com.br\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/ambarenergia.com.br\/en\/#organization\",\"name\":\"\u00c2mbar Energia\",\"url\":\"https:\/\/ambarenergia.com.br\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/ambarenergia.com.br\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/ambarenergia.com.br\/wp-content\/uploads\/2024\/04\/Logo_Ambar_Energia_CMYK-01_edited.webp\",\"contentUrl\":\"https:\/\/ambarenergia.com.br\/wp-content\/uploads\/2024\/04\/Logo_Ambar_Energia_CMYK-01_edited.webp\",\"width\":260,\"height\":102,\"caption\":\"\u00c2mbar Energia\"},\"image\":{\"@id\":\"https:\/\/ambarenergia.com.br\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/br.linkedin.com\/company\/ambar-energia\",\"https:\/\/www.instagram.com\/ambarenergia\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/ambarenergia.com.br\/en\/#\/schema\/person\/b9589679b1ad2fe56bfa57eb11e6f9df\",\"name\":\"Gabriela Vinhal\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/ambarenergia.com.br\/en\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/a168e6e97681cac3a9507adcfa3c9d0a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/a168e6e97681cac3a9507adcfa3c9d0a?s=96&d=mm&r=g\",\"caption\":\"Gabriela Vinhal\"},\"url\":\"https:\/\/ambarenergia.com.br\/en\/author\/gabriela-vinhal\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"\u00c2mbar Energia signs contract to acquire Arauc\u00e1ria Thermoelectric Power Plant, in Paran\u00e1 - \u00c2mbar Energy","description":"Energy generation, transmission and commercialization","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/ambarenergia.com.br\/en\/ambar-energia-signs-contract-to-acquire-araucaria-thermoelectric-power-plant-in-parana\/","og_locale":"en_US","og_type":"article","og_title":"\u00c2mbar Energia signs contract to acquire Arauc\u00e1ria Thermoelectric Power Plant, in Paran\u00e1 - \u00c2mbar Energy","og_description":"Energy generation, transmission and commercialization","og_url":"https:\/\/ambarenergia.com.br\/en\/ambar-energia-signs-contract-to-acquire-araucaria-thermoelectric-power-plant-in-parana\/","og_site_name":"\u00c2mbar Energy","article_published_time":"2023-12-14T17:01:41+00:00","article_modified_time":"2024-06-21T19:27:43+00:00","og_image":[{"width":800,"height":477,"url":"https:\/\/ambarenergia.com.br\/wp-content\/uploads\/2024\/05\/UEGA-2.jpg","type":"image\/jpeg"}],"author":"Gabriela Vinhal","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Gabriela Vinhal","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/ambarenergia.com.br\/en\/ambar-energia-signs-contract-to-acquire-araucaria-thermoelectric-power-plant-in-parana\/#article","isPartOf":{"@id":"https:\/\/ambarenergia.com.br\/en\/ambar-energia-signs-contract-to-acquire-araucaria-thermoelectric-power-plant-in-parana\/"},"author":{"name":"Gabriela Vinhal","@id":"https:\/\/ambarenergia.com.br\/en\/#\/schema\/person\/b9589679b1ad2fe56bfa57eb11e6f9df"},"headline":"\u00c2mbar Energia signs contract to acquire Arauc\u00e1ria Thermoelectric Power Plant, in Paran\u00e1","datePublished":"2023-12-14T17:01:41+00:00","dateModified":"2024-06-21T19:27:43+00:00","mainEntityOfPage":{"@id":"https:\/\/ambarenergia.com.br\/en\/ambar-energia-signs-contract-to-acquire-araucaria-thermoelectric-power-plant-in-parana\/"},"wordCount":344,"publisher":{"@id":"https:\/\/ambarenergia.com.br\/en\/#organization"},"image":{"@id":"https:\/\/ambarenergia.com.br\/en\/ambar-energia-signs-contract-to-acquire-araucaria-thermoelectric-power-plant-in-parana\/#primaryimage"},"thumbnailUrl":"https:\/\/ambarenergia.com.br\/wp-content\/uploads\/2024\/05\/UEGA-2.jpg","keywords":["Energy security"],"articleSection":["\u00c2mbar"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/ambarenergia.com.br\/en\/ambar-energia-signs-contract-to-acquire-araucaria-thermoelectric-power-plant-in-parana\/","url":"https:\/\/ambarenergia.com.br\/en\/ambar-energia-signs-contract-to-acquire-araucaria-thermoelectric-power-plant-in-parana\/","name":"\u00c2mbar Energia signs contract to acquire Arauc\u00e1ria Thermoelectric Power Plant, in Paran\u00e1 - \u00c2mbar Energy","isPartOf":{"@id":"https:\/\/ambarenergia.com.br\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/ambarenergia.com.br\/en\/ambar-energia-signs-contract-to-acquire-araucaria-thermoelectric-power-plant-in-parana\/#primaryimage"},"image":{"@id":"https:\/\/ambarenergia.com.br\/en\/ambar-energia-signs-contract-to-acquire-araucaria-thermoelectric-power-plant-in-parana\/#primaryimage"},"thumbnailUrl":"https:\/\/ambarenergia.com.br\/wp-content\/uploads\/2024\/05\/UEGA-2.jpg","datePublished":"2023-12-14T17:01:41+00:00","dateModified":"2024-06-21T19:27:43+00:00","description":"Energy generation, transmission and commercialization","breadcrumb":{"@id":"https:\/\/ambarenergia.com.br\/en\/ambar-energia-signs-contract-to-acquire-araucaria-thermoelectric-power-plant-in-parana\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/ambarenergia.com.br\/en\/ambar-energia-signs-contract-to-acquire-araucaria-thermoelectric-power-plant-in-parana\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/ambarenergia.com.br\/en\/ambar-energia-signs-contract-to-acquire-araucaria-thermoelectric-power-plant-in-parana\/#primaryimage","url":"https:\/\/ambarenergia.com.br\/wp-content\/uploads\/2024\/05\/UEGA-2.jpg","contentUrl":"https:\/\/ambarenergia.com.br\/wp-content\/uploads\/2024\/05\/UEGA-2.jpg","width":800,"height":477},{"@type":"BreadcrumbList","@id":"https:\/\/ambarenergia.com.br\/en\/ambar-energia-signs-contract-to-acquire-araucaria-thermoelectric-power-plant-in-parana\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"In\u00edcio","item":"https:\/\/ambarenergia.com.br\/en\/"},{"@type":"ListItem","position":2,"name":"\u00c2mbar Energia signs contract to acquire Arauc\u00e1ria Thermoelectric Power Plant, in Paran\u00e1"}]},{"@type":"WebSite","@id":"https:\/\/ambarenergia.com.br\/en\/#website","url":"https:\/\/ambarenergia.com.br\/en\/","name":"\u00c2mbar Energia","description":"Energy generation, transmission and commercialization","publisher":{"@id":"https:\/\/ambarenergia.com.br\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/ambarenergia.com.br\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/ambarenergia.com.br\/en\/#organization","name":"\u00c2mbar Energia","url":"https:\/\/ambarenergia.com.br\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/ambarenergia.com.br\/en\/#\/schema\/logo\/image\/","url":"https:\/\/ambarenergia.com.br\/wp-content\/uploads\/2024\/04\/Logo_Ambar_Energia_CMYK-01_edited.webp","contentUrl":"https:\/\/ambarenergia.com.br\/wp-content\/uploads\/2024\/04\/Logo_Ambar_Energia_CMYK-01_edited.webp","width":260,"height":102,"caption":"\u00c2mbar Energia"},"image":{"@id":"https:\/\/ambarenergia.com.br\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/br.linkedin.com\/company\/ambar-energia","https:\/\/www.instagram.com\/ambarenergia"]},{"@type":"Person","@id":"https:\/\/ambarenergia.com.br\/en\/#\/schema\/person\/b9589679b1ad2fe56bfa57eb11e6f9df","name":"Gabriela Vinhal","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/ambarenergia.com.br\/en\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/a168e6e97681cac3a9507adcfa3c9d0a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/a168e6e97681cac3a9507adcfa3c9d0a?s=96&d=mm&r=g","caption":"Gabriela Vinhal"},"url":"https:\/\/ambarenergia.com.br\/en\/author\/gabriela-vinhal\/"}]}},"uagb_featured_image_src":{"full":["https:\/\/ambarenergia.com.br\/wp-content\/uploads\/2024\/05\/UEGA-2.jpg",800,477,false],"thumbnail":["https:\/\/ambarenergia.com.br\/wp-content\/uploads\/2024\/05\/UEGA-2-150x150.jpg",150,150,true],"medium":["https:\/\/ambarenergia.com.br\/wp-content\/uploads\/2024\/05\/UEGA-2-300x179.jpg",300,179,true],"medium_large":["https:\/\/ambarenergia.com.br\/wp-content\/uploads\/2024\/05\/UEGA-2-768x458.jpg",768,458,true],"large":["https:\/\/ambarenergia.com.br\/wp-content\/uploads\/2024\/05\/UEGA-2.jpg",800,477,false],"1536x1536":["https:\/\/ambarenergia.com.br\/wp-content\/uploads\/2024\/05\/UEGA-2.jpg",800,477,false],"2048x2048":["https:\/\/ambarenergia.com.br\/wp-content\/uploads\/2024\/05\/UEGA-2.jpg",800,477,false]},"uagb_author_info":{"display_name":"Gabriela Vinhal","author_link":"https:\/\/ambarenergia.com.br\/en\/author\/gabriela-vinhal\/"},"uagb_comment_info":0,"uagb_excerpt":"Acquisition is part of the growth strategy in energy security assets and South American integration \u00c2mbar Energia, a company of the J&amp;F group, announced the signing of a contract for the purchase of 81.2% of the Arauc\u00e1ria Thermoelectric Power Plant (UTE Arauc\u00e1ria), located in the municipality of the same name, in Paran\u00e1. The asset belongs&hellip;","_links":{"self":[{"href":"https:\/\/ambarenergia.com.br\/en\/wp-json\/wp\/v2\/posts\/4464","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ambarenergia.com.br\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ambarenergia.com.br\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ambarenergia.com.br\/en\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/ambarenergia.com.br\/en\/wp-json\/wp\/v2\/comments?post=4464"}],"version-history":[{"count":1,"href":"https:\/\/ambarenergia.com.br\/en\/wp-json\/wp\/v2\/posts\/4464\/revisions"}],"predecessor-version":[{"id":4465,"href":"https:\/\/ambarenergia.com.br\/en\/wp-json\/wp\/v2\/posts\/4464\/revisions\/4465"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ambarenergia.com.br\/en\/wp-json\/wp\/v2\/media\/4310"}],"wp:attachment":[{"href":"https:\/\/ambarenergia.com.br\/en\/wp-json\/wp\/v2\/media?parent=4464"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ambarenergia.com.br\/en\/wp-json\/wp\/v2\/categories?post=4464"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ambarenergia.com.br\/en\/wp-json\/wp\/v2\/tags?post=4464"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}