Operation:
LT 500 kV Marimbondo – Assis
The Triângulo Mineiro operation includes the Marimbondo II and Assis substations as well as a 297-km-long transmission line linking the Marimbondo II (Minas Gerais) and Assis (São Paulo) substations.
Access the environmental study:
Beginning of construction: | May de 2014 |
Beginning of operation | June de 2016 |
End of concession: | 2043 |
Voltage: | 500 kV |
Extension (Km): | 297 |
Location