Areas of Operation / Distribution Triângulo Mineiro

Operation:

LT 500 kV Marimbondo – Assis

The Triângulo Mineiro operation includes the Marimbondo II and Assis substations as well as a 297-km-long transmission line linking the Marimbondo II (Minas Gerais) and Assis (São Paulo) substations.

Access the environmental study:

LT 500 kV Marimbondo – Assis

Beginning of construction:May de 2014
Beginning of operationJune de 2016
End of concession:2043
Voltage:500 kV
Extension (Km):297