Operation:
LT 500 kV Samambaia – Brasília
The Vale do São Bartolomeu operation encompasses four transmission lines between Brasilia (DF) and Luziânia (Goiás), totaling 94.6 kilometers. Altogether there are five substations (Brasília Sul, Brasília Geral, Samambaia, Luziânia and Brasília Leste Substations).
Beginning of construction: | April de 2014 |
Beginning of operation: | April de 2017 |
End of concession: | 2043 |
Voltage: | 500 kV |
Extension (Km): | 94.6 |
Location
Samambaia Bay terminal
Luziania Bay terminal