Operation:

LT 500 kV Samambaia – Brasília

The Vale do São Bartolomeu operation encompasses four transmission lines between Brasilia (DF) and Luziânia (Goiás), totaling 94.6 kilometers. Altogether there are five substations (Brasília Sul, Brasília Geral, Samambaia, Luziânia and Brasília Leste Substations).

Beginning of construction:April de 2014
Beginning of operation:April de 2017
End of concession:2043
Voltage:500 kV
Extension (Km):94.6